Quickfilter

The cable system in the dry dock, the test transformer far away on the back of the truck. HV tests for off-shore systems can be pretty tricky. A PFISTERER-developed adapter solves this problem.

More

A new benchmark in user-friendly design: Speedy termination installation cut overhead line downtimes from several weeks to just a few days. The secret? Award-winning dry IXOSIL EST terminations by PFISTERER.

More

Q7 is the Netherlands’ first off-shore wind farm outside of the territorial zone (12 nautical miles). Here, CONNEX cable connections are not the only things that need to show off their sea legs. PFISTERER experts have to showcase their bravery, too.

More

Kraftwerke Oberhasli AG (KWO), a Swiss energy supplier, runs some of the most powerful hydropower plants in Europe but some of the plants have started to show their age. For the upgrades, the operators relied on PFISTERER technology.

 

More

The Park Substation built by Anaheim city council in California is the USA’s first distribution station to be built underground. Also in on the action: the CONNEX connection system by PFISTERER.

More

Ideal dimensions and a patented spring system make the TENSOREX C+ the winner of tests by the Austrian Railway Network. It makes sure wires and cables are perfectly tensioned no matter what the weather, even in narrow tunnels.

More

14 staff, 13 weeks, 5,800 meters of cable: PFISTERER installed the first ever cable system certified for off-shore use at the Global Tech I off-shore wind farm.

More