News

News from the world of PFISTERER. From press releases to new products.

All Events

The SEANEX inner cone solution by PFISTERER is an offshore variant of the successful CONNEX HV connection system that is specially adapted for 66 kV inter-array cabling. The new offshore accessories combines all the proven performance features – salt water resistance, solid insulation, pluggable and touch-safe – yet it is much more compact, lighter in weight, and lower in cost.

More

Westnetz, one of Germany’s largest distribution network operators, is building a 17 km underground cable system in Hunsrück as part of their efforts to support the transition to renewable energy. This new high-voltage cable will transport renewable wind power from turbines at Hunsrück to the region's urban centres.

More

At Amper 2019, the international electrotechnics and electronics trade fair in Brno, Czech Republic, PFISTERER was awarded the Golden Amper for FrontCon, its innovative connection and contacting technology for quickly and safely joining single-strand insulated power cables. This is the second time that PFISTERER has gained recognition with this award.

More

In cooperation with the cable manufacturer TELE-FONIKA Kable and the international cable and pipeline installation contractor VolkerInfra, PFISTERER has been awarded the contract for the supply of the 220 kV land cable accessories for the grid connection of the new Moray East Offshore Windfarm.

More

The PFISTERER subsidiaries, PFISTERER SEFAG AG and PFISTERER IXOSIL AG, merged on Friday, October 26, 2018. Both companies belong to the PFISTERER Group for many years and have exceptional expertise in their fields - SEFAG for overhead lines and IXOSIL for cable systems.

More

LAPP Insulators, a member of the PFISTERER Group of companies, has equipped the famous Faraday cage at the Deutsches Museum in Munich with brand-new insulators. Among the first visitors after the refit were the television channel ZDF with the astrophysicist, presenter and university lecturer, Professor Harald Lesch.

More

The 2018 issue of the PFISTERER customer magazine reports on interesting projects from all resorts of the PFISTERER Group. For example, read how energy infrastructure can be made fit for the future already today.

More

PFISTERER has accompanied the emergence of the offshore wind industry right from the start with innovative products and solutions. In the future, the commitment will be further strengthened and bundled in a specialized team under the management of Dr. Peter Müller within the PTS (Power Transmission Solutions) Business Unit Cable.

More