News

Quickfilter
All Events

In the latest two-wing prototypes in Husumer wind test field in the North Sea’s largest wind farm, Global Tech I, and in almost every high-speed train in Europe, the PLUG connection system by PFISTERER guarantees the secure transmission of power.

More

The growing trend for building off-shore wind farms across larger expanses of space, using more powerful turbines, and designing an increasing number of ring-type connection system has resulted in an increase to the amount of power that needs to be transmitted between the turbines and the substation.

More