The new CONNECT Magazine

The 2018 issue of the PFISTERER customer magazine reports on interesting projects from all resorts of the PFISTERER Group. For example, read how energy infrastructure can be made fit for the future already today.

The example of a simple cable connection shows innovative possibilities with potential savings over the lifetime of the system. In addition, the offshore platform BorWin3 was built in Dubai. Currently, the 18,000-ton- giant is on its 12,000-kilometer "cruise" in the North Sea. PFISTERER supplied and assembled the whole 155 kV cabling with his local team in Dubai and made them seaworthy for the journey. And in Hungary, the railway Budapest Esztergom was electrified. It was completely omitted on classic tension wheel assemblies. TENSOREX, the innovative spring-based tensioning system from PFISTERER, ensures the right tension on the contact wire. These are only three examples of future-oriented and efficient energy infrastructure projects presented in the current CONNECT. You can find it as a PDF download here.