The solution
PFISTERER supported the construction of the platform with comprehensive engineering and planning services, supervised the installation and carried out high-voltage testing of the HV cables. Around 200 plug-in CONNEX high-voltage fittings, epoxy resin joints and link boxes were installed to ensure reliable power transmission. Special attention was paid to the first-time use of GIS systems for both the AC and DC sides, which brought considerable space advantages on the platform.