Skip to main content

Realizing
THE FUTURE

In (big) cities and in the countryside, on the coast and at sea, in this country and around the world - in numerous successful projects, innovative products and reliable services from PFISTERER have helped make energy infrastructure future-proof. Here is a selection of these projects.

“As a cable-independent manufacturer of the CONNEX cable connection system, PFISTERER was able to offer us a fast-deploying solution in a very short time.”

Torsten Kröger, operation and service of 110 kV overhead line and cable networks of Schleswig-Holstein Netz AG

PFISTERER hat gezeigt, dass das Unternehmen auch ALS ANBIETER VON KOMPLETT-LÖSUNGEN HÖCHSTE ANFORDERUNGEN ERFÜLLT.

Juan Carlos Sanchez, Canary Islands Project Director von Red Eléctrica de España (REE)

„ALS WELTMARKTFÜHRER IN IHREM BEREICH, haben wir uns für PFISTERER für die 220 kV-AUSSTATTUNG FÜR DEN WINDPARK MORAY FIRTH ENTSCHIEDEN.

Peter Cooke, Technical Development Director, Volkerinfra.

References

Energy transmission
Underground cables
As part of the conversion from the 30 kV medium-voltage level to the national 110 kV level, new lines and substations have been built in Gera. The general contractor Siemens needed a fast, robust and…
Energy transmission
Substations
When building the new Klus substation in Solothurn, the focus was on the maximum possible personal safety.
Energy transmission
Overhead lines
Critical winds can cause considerable damage to overhead lines, such as snapped cables and cracked foundations.
Safety technology
During operation of the Gotthard Base Tunnel, which passes through the mountain massif at a record length of 57 km, the tracks must remain passable for diesel-powered emergency vehicles at all times.
Energy transmission
Overhead lines
Réseau de Transport d’Électricité (RTE), operator of the largest transmission grid in Europe, needed a tailor-made integration of silicone composite insulators into existing chain designs that were…
Energy transmission
Overhead lines
In the field of compact cables, ever higher demands are being placed on the stability and safety of insulating crossbars. When constructing a prototype for a 420 kV insulated lifting beam, PFISTERER…