In (big) cities and in the countryside, on the coast and at sea, in this country and around the world - in numerous successful projects, innovative products and reliable services from PFISTERER have helped make energy infrastructure future-proof. Here is a selection of these projects.

“As a cable-independent manufacturer of the CONNEX cable connection system, PFISTERER was able to offer us a fast-deploying solution in a very short time.”

Torsten Kröger, operation and service of 110 kV overhead line and cable networks of Schleswig-Holstein Netz AG

PFISTERER hat gezeigt, dass das Unternehmen auch ALS ANBIETER VON KOMPLETT-LÖSUNGEN HÖCHSTE ANFORDERUNGEN ERFÜLLT.

Juan Carlos Sanchez, Canary Islands Project Director von Red Eléctrica de España (REE)

„ALS WELTMARKTFÜHRER IN IHREM BEREICH, haben wir uns für PFISTERER für die 220 kV-AUSSTATTUNG FÜR DEN WINDPARK MORAY FIRTH ENTSCHIEDEN.

Peter Cooke, Technical Development Director, Volkerinfra.

References

Energy transmission
Underground cables
Installation of a bypass line at the Parndorf wind farm under tough conditions while the parallel system remains in operation.
Wind
Installation of a reliable and maintenance-free connection system for the transformer station and switchgear at the Q7 offshore wind farm, 23 km off the coast of the Netherlands.
Underground cables
Renewing and upgrading the hydropower plants of Kraftwerke Oberhasli AG (KWO) in order to increase the overall performance of the system and utilize hydropower more efficiently.
Energy distribution
Distribution station
Construction of an underground distribution station in a residential neighborhood that needs to be quiet, safe and invisible to meet the aesthetic and functional requirements of the City of Anaheim.
Wind
Connecting the switchgear and transformers in the Global Tech I offshore wind farm, one of the first and largest commercial wind farms in the German North Sea, under extreme conditions and with…